Hi All
Today I finished the lathe work on the check valve bodies. All that is left to do on the body parts are to drill the six holes for the boiler flange.
Moving right along
LABOR DAY PRODUCTION
- Trainman4602
- Posts: 3482
- Joined: Sat Oct 16, 2004 9:26 pm
- Location: New Jersey
LABOR DAY PRODUCTION
ALLWAYS OPERATING MY TRAIN IN A SAFE MANNER USING AUTOMATIC AIR BRAKES