CSME Double Tracking Progress

This forum is dedicated to the Live Steam Hobbyist Community.

Moderators: cbrew, Harold_V

User avatar
johnpenn74
Posts: 404
Joined: Tue May 04, 2010 12:54 pm
Location: Waiting for next assignment!

CSME Double Tracking Progress

Post by johnpenn74 »

Once more into the breach!

If you have been to Eaglepoint RR in Chattanooga in the last year or so you probably seen the persistent work by members to double track the old main from Eaglepoint to Saddleback. Right now this amounts for about 3/5 of the original main line. All of this effort is two part: 1) to reduce the congestion created by traffic branching off for the mountain division and 2) straightening curves and bumps to make at the original main more accommodating to engines like 4-8-4s, 2-8-4s, 4-8-2s and other similar large stuff. With this project we are also upgrading the double main signals to automatic block.

We were making good time till the snow started creeping in... :-)

Well enjoy the pics and check back here for periodic updates.
Attachments
1031181337.jpg
1031181524.jpg
cg 004.jpg
irr 006 double boxpng.png
CSME CG to saddleback.png
1209180706a.jpg
John Pennington

Logging meets that actually move logs

Project
2 Mich-Cal Shays
Allen 4-4-0 Narrow Gauge Conversion
Two Reading A5a Camelback 0-4-0
USRA 0-6-0
Clishay
4 Western Wheeled Scraper NG Dump Cars
N&W 4-8-2
ICM 2-10-2
4 Modern Stake Cars
L&N Caboose
4 Big Four Conversion Gondolas

Like I'm actually gonna build all this stuff :-P
User avatar
johnpenn74
Posts: 404
Joined: Tue May 04, 2010 12:54 pm
Location: Waiting for next assignment!

Re: CSME Double Tracking Progress

Post by johnpenn74 »

A few more construction pics from Chestnut Grove.
Attachments
030318 The wall (1).jpg
030318 The wall (2).jpg
cg 003.jpg
John Pennington

Logging meets that actually move logs

Project
2 Mich-Cal Shays
Allen 4-4-0 Narrow Gauge Conversion
Two Reading A5a Camelback 0-4-0
USRA 0-6-0
Clishay
4 Western Wheeled Scraper NG Dump Cars
N&W 4-8-2
ICM 2-10-2
4 Modern Stake Cars
L&N Caboose
4 Big Four Conversion Gondolas

Like I'm actually gonna build all this stuff :-P
User avatar
Steggy
Posts: 1984
Joined: Tue Jun 28, 2011 9:19 pm
Location: JB Pritzker’s Hellhole
Contact:

Re: CSME Double Tracking Progress

Post by Steggy »

johnpenn74 wrote: Mon Dec 10, 2018 7:17 pmWell enjoy the pics and check back here for periodic updates.
How come the pictures are rotated on their sides?
———————————————————————————————————————————————————————
Music isn’t at all difficult.  All you gotta do is play the right notes at the right time!  :D
tomc
Posts: 375
Joined: Sun Oct 16, 2005 7:04 pm
Location: Sw of the Windy City

Re: CSME Double Tracking Progress

Post by tomc »

He didnt hold his Iphone correctly or didnt correct orientation in a photo editor. I had to learn how to take pics & vids to show on non iphone equipment.

Tom C.
tom_at_srclry_com
A student of the Southend RGS!
User avatar
NP317
Posts: 4589
Joined: Tue Jun 24, 2014 2:57 pm
Location: Northern Oregon, USA

Re: CSME Double Tracking Progress

Post by NP317 »

He took the photos near the equator?
:shock: :lol:
~RN
User avatar
johnpenn74
Posts: 404
Joined: Tue May 04, 2010 12:54 pm
Location: Waiting for next assignment!

Re: CSME Double Tracking Progress

Post by johnpenn74 »

Guys your supposed to be interested in all that good looking track work.....not my technical snafu.... :-)

Yeah, I don't know what's up with the tilt.... Looks ok in the lap top. I have an LG Android. Anyone know how to fix?
Here's some more pictures on the main. From another phone.

JP
Attachments
CG 092218 Chestnut Grove a.jpg
CG 092218 Chestnut Grove b.jpg
John Pennington

Logging meets that actually move logs

Project
2 Mich-Cal Shays
Allen 4-4-0 Narrow Gauge Conversion
Two Reading A5a Camelback 0-4-0
USRA 0-6-0
Clishay
4 Western Wheeled Scraper NG Dump Cars
N&W 4-8-2
ICM 2-10-2
4 Modern Stake Cars
L&N Caboose
4 Big Four Conversion Gondolas

Like I'm actually gonna build all this stuff :-P
rkcarguy
Posts: 1730
Joined: Tue Aug 22, 2017 10:33 am
Location: Wa State

Re: CSME Double Tracking Progress

Post by rkcarguy »

Looks good! Also looks hard fought where the rock retaining wall had to be pushed out and filled to suit the 2nd line.
User avatar
johnpenn74
Posts: 404
Joined: Tue May 04, 2010 12:54 pm
Location: Waiting for next assignment!

CSME Double Tracking Progress - Winter progress

Post by johnpenn74 »

Ok, time for an update.
This portion of work was completed in a few work sessions between December 2018, Feb 2019 and March 2019. While water does freeze in Tennessee, it isn't impossible to keep working, that and the winter was not too harsh. The pictures are of Saddleback Wye and the dominant main line (the double track one) that goes through it. A 2nd survey showing a great improvement of the previous; a few dips to clean up but well thats why we measure our work during construction not after it. All in all a lot of hard work and a positive step in the right direction.

Next up? Hooking Chestnut grove to Gargoyle... Baring the break out of the Apacolypse, we should have these two major sections connected by the Spring Meet 2019. Come on out and take a gander.

JP
Attachments
CSME Double Looking East.jpg
CSME CG to saddleback.png
CSME Survey CB to SB survey 002.png
Saddle Back west before after.jpg
CSME Double Track Item 020 CG to TB 002.jpg
John Pennington

Logging meets that actually move logs

Project
2 Mich-Cal Shays
Allen 4-4-0 Narrow Gauge Conversion
Two Reading A5a Camelback 0-4-0
USRA 0-6-0
Clishay
4 Western Wheeled Scraper NG Dump Cars
N&W 4-8-2
ICM 2-10-2
4 Modern Stake Cars
L&N Caboose
4 Big Four Conversion Gondolas

Like I'm actually gonna build all this stuff :-P
User avatar
johnpenn74
Posts: 404
Joined: Tue May 04, 2010 12:54 pm
Location: Waiting for next assignment!

Re: CSME Double Tracking Progress

Post by johnpenn74 »

Time for an update...

It seem like there is never enough dirt... I mean time... Or both actually. The usual suspects were at it again in the last few weeks and we now have the track all the way up to the twin bridges. Sorry no pictures. This last will connect the run from Saddleback all the way to Stillhouse.

But I do have a few photos to share of still house siding. This siding is the next big area or construction. The stillhouse bridge is being double tracked and a Helper siding is being added in the middle of the two mainline tracks. This is sorta based on Saluda grade and will be the prototype helper addition / layover point for trains going up the mountain division. Momentum is up and should be in by Fall meet.

Work is also starting on the Eagle Point end of things. We are excavating our parking lot so we have lot dirt to get rid of. Well, that's just a good time to put it on the main line. See photos.

See you at the track.

JP
Attachments
CSME Double Track 2019 Spring Progress.jpg
CSME Double Track Item 044 Still House Pocket.jpg
John Pennington

Logging meets that actually move logs

Project
2 Mich-Cal Shays
Allen 4-4-0 Narrow Gauge Conversion
Two Reading A5a Camelback 0-4-0
USRA 0-6-0
Clishay
4 Western Wheeled Scraper NG Dump Cars
N&W 4-8-2
ICM 2-10-2
4 Modern Stake Cars
L&N Caboose
4 Big Four Conversion Gondolas

Like I'm actually gonna build all this stuff :-P
User avatar
johnpenn74
Posts: 404
Joined: Tue May 04, 2010 12:54 pm
Location: Waiting for next assignment!

Re: CSME Double Tracking Progress

Post by johnpenn74 »

We're off and running again. Started the demo work on the EP - Summit Main section. Since this pic was taken we have put about 1/3 of main #1 back in. Should have it all done by Spring meet. Come and see.

JP
Attachments
ep 090.jpg
SM 001.jpg
John Pennington

Logging meets that actually move logs

Project
2 Mich-Cal Shays
Allen 4-4-0 Narrow Gauge Conversion
Two Reading A5a Camelback 0-4-0
USRA 0-6-0
Clishay
4 Western Wheeled Scraper NG Dump Cars
N&W 4-8-2
ICM 2-10-2
4 Modern Stake Cars
L&N Caboose
4 Big Four Conversion Gondolas

Like I'm actually gonna build all this stuff :-P
Steven E. Kuhn
Posts: 313
Joined: Fri May 12, 2006 8:22 am
Location: Joliet, Illinois

Re: CSME Double Tracking Progress

Post by Steven E. Kuhn »

JOHNPENN74 wrote:

Once more into the breach!

If you have been to Eaglepoint RR in Chattanooga in the last year or so you probably seen the persistent work by members to double track the old main from Eaglepoint to Saddleback. Right now this amounts for about 3/5 of the original main line. All of this effort is two part: 1) to reduce the congestion created by traffic branching off for the mountain division and 2) straightening curves and bumps to make at the original main more accommodating to engines like 4-8-4s, 2-8-4s, 4-8-2s and other similar large stuff. With this project we are also upgrading the double main signals to automatic block.

We were making good time till the snow started creeping in... :-)

Well enjoy the pics and check back here for periodic updates.








I took the first four photos in the thread and turned them right side up. Got tired of cranking my head over. Thanks for the update. Looking forward to seeing Eagle Point again in the near future. Lots of hardwork going on with the retaining wall and the track. Looks nice!

Steve Kuhn
Attachments
1031181337.jpg
1031181337.jpg (99.76 KiB) Viewed 6904 times
1031181524.jpg
1031181524.jpg (98.52 KiB) Viewed 6904 times
cg 004.jpg
cg 004.jpg (102.13 KiB) Viewed 6904 times
1209180706a.jpg
1209180706a.jpg (108.94 KiB) Viewed 6904 times
Last edited by Steven E. Kuhn on Mon Jan 13, 2020 5:58 pm, edited 5 times in total.
Steven E. Kuhn
Posts: 313
Joined: Fri May 12, 2006 8:22 am
Location: Joliet, Illinois

Re: CSME Double Tracking Progress

Post by Steven E. Kuhn »

One more from a later post.
Attachments
cg 003.jpg
cg 003.jpg (100.84 KiB) Viewed 6901 times
Post Reply