A local group has asked me to put together a proposal for a short loop of 7.5" track around a mini-park located on a nearby small airport. After doing some rough drawings, the total mainline trackage will be about 637 feet with a 40ft min. curve radius. This will allow us to handle most any locomotive and car out there, should they come to visit.

I am thinking that plastic ties and steel rails on ballast on our hard desert earth would be a decent way to go for minimal maintenance. There is very little rain here. If done right, do you think a once a month check and tamping would be sufficient to keep it maintained? There will be no formal club to support this track so things need to be kept simple and to a minimum, with as little maintenance as possible. Just one or two people available to help, more like a home track.

This track would not be used very often in the beginning, maybe a few times a month at most and lightly so. Eventually if a non-profit group decided to give rides to the public on a regular basis, it could see more use.

Another idea came up of using steel rail welded to steel ties, like permanent panel track. If it was bolted to a concrete path, that would maybe make sense, but if it's sitting on ballast the plastic long depth ties would probably be better, eh?

I have a question regarding ballast. What type and size of stone do you use, and has anyone calculated a rough cost per foot or per 10 feet of track? (or pounds per foot, from which a cost could be derrived from current prices...)

--Mike
Live Steam Photography and more - gallery.mikemassee.com
Product Development and E-Commerce, Allen Models of Nevada
User avatar
makinsmoke
Posts: 2265
Joined: Thu Jul 10, 2003 12:56 pm
Location: Texas Hill Country

track questions and ballast

Post by makinsmoke »

Mike, Each locale has something a little different.

In the desert with minimum shade you will probably have more expansion and chances of sun kinks than other places. Whatever way you choose be sure and leave joints loose every so often to allow for the expansion (and contraction). Aluminum expands more than steel so steel would be a plus. Aluminum is also getting as expensive or more so than steel.

Plastic ties are something that a lot of folks are going to, and if you can get them and they compare favorably with wood, why not? You will have less damage due to rot in the desert with wood than in other parts in the country, so that is maybe a wash.

You need to ensure that the undelayer is pretty stable, which I would guess it is. In that case, a minor ditching (a couple of inches) and caliche or just gravel right on the hard pan may be all you need. Be sure and prepare for the occasional flash floods and runoff and allow for drainage.

The rock I bought is called chat or something and is 3/4". Do not buy river rock as it is smooth and wil not stay in place. The stuff you want looks like it was broken up and has very rough edges.

As far as maintenance, once properly laid it wil be entirely up to the vagaries and whims of the environment as to how much you will need. Just monitor it and adjust your work schedule as necessary.

My two cents.
Brian
willy

Post by willy »

Makin is reffering to what agrate business calls 1" minus.

I prefer some thing smaller like 1/2" minus or peastone. I also let the grass grow into it and lock it all up.

LALS uses some stuff called DG (I think it meant decompsed granite, interesting stuff, a rock crubles in your hand, compresses very nicely). Comes right off the hillside.

What you use really depends on you. I have heard of some that used concrete, yet if you get a wash out, getting your track straight will be difficult. A fellow in Canada has totally welded his track. He uses angle iron for ties and once he gets it pushed into the ground it wont go anywhere.
Curtis_F
Posts: 848
Joined: Mon Jan 06, 2003 10:14 am
Location: Reedley, Ca. 93274
Contact:

Post by Curtis_F »

Makin is reffering to what agrate business calls 1" minus.
Actually it sounds like "3/4 crushed", which is what several Grand Scale railroads use for ballast out here on the West Coast.

"Crushed" means that the rock has been broken up (crushed) and will fit through a screen mesh of it's stated size, but not through a screen mesh of the next size smaller. The jagged edges give the rock very good interlocking propertes to keep it from migrating too much, but still open enough to allow for drainage of water through the rock.

"Minus" means that the rock will fit through a screen mesh of it's stated size and has not been filtered through another screen. So a "Minus" containes crushed rock of the stated size and all sizes smaller down to dust. Once in place this stuff can setup like concrete as all the different sizes of rock can really compact and interlock together.
LALS uses some stuff called DG (I think it meant decompsed granite,..
Yep. That's what it is.
25+ Years of SolidWorks experience...now I feel old.
"You can lead a horse to water, but you can't make him drink."
"Winning an argument on the internet is like winning the Special Olympics."
www.facebook.com/HillcrestShops
User avatar
Harlock
Posts: 3833
Joined: Tue Jan 23, 2007 1:19 am
Contact:

Post by Harlock »

Guys, wonderful information on the ballast...a friend had mentioned the aspect about the rough pieces locking together, so that all makes good sense.

If anyone has a clue as to how much they used for a particular amount of track, I'd love that nugget of information.
Live Steam Photography and more - gallery.mikemassee.com
Product Development and E-Commerce, Allen Models of Nevada
User avatar
Harlock
Posts: 3833
Joined: Tue Jan 23, 2007 1:19 am
Contact:

Re: track questions and ballast

Post by Harlock »

makinsmoke wrote: In the desert with minimum shade you will probably have more expansion and chances of sun kinks than other places. Whatever way you choose be sure and leave joints loose every so often to allow for the expansion (and contraction). Aluminum expands more than steel so steel would be a plus. Aluminum is also getting as expensive or more so than steel.
Yup. Plus I've heard three or four stories of aluminum track theft on this and other boards in the last few years.

An interesting thing I learned at Maricopa Live Steamers is that they completely bury their wood ties below the sandy dirt, because the sun bleaching dries out and ruins the ties faster than the earth will.

In any case I'm aiming for the plastic ties, not sure if that is so much of an issue with those.

--Mike
Live Steam Photography and more - gallery.mikemassee.com
Product Development and E-Commerce, Allen Models of Nevada
bcody
Posts: 954
Joined: Wed Oct 29, 2003 12:07 am

TRACK TURN RADIUS

Post by bcody »

I would strongly suggest you increase your turn radius to 60 feet. You will find that some rod engines will not tolerate the 40 foot radius. If I tried to run my MCC GE Dash 9 there it would spread the rails. My three axle trucks have a rigid length of 23.5" and with over 400 pounds on each truck it would destroy a turn with only a 40 foot radius. Been there, done that at our track in Minden, NV. I don't run my diesel there anymore. Bill
User avatar
Bill Wilkins
Posts: 358
Joined: Sun Apr 06, 2008 8:59 pm
Location: Northwestern Ohio

Stone

Post by Bill Wilkins »

Here in Ohio you would go to the quarry and ask for "sixes" (for the bed) Thats the size everyone is talking about. Then for in between the ties you would want "eights", the size of the end of your little finger.

Thats how we do it here...

Bill W.
User avatar
Greg_Lewis
Posts: 3022
Joined: Wed Jan 15, 2003 2:44 pm
Location: Fresno, CA

Post by Greg_Lewis »

The track that Bill mentions above is owned by Ken Schroeder and he has some sections out back that use square tubing for rails. While his environment is quite different than yours you might check with him to see how it has worked out. He welds angle iron between the rails every few feet to hold it in gauge. His contact number is listed in the club section in the back of Live Steam magazine under "Northern Nevada Live Steamers."
Greg Lewis, Prop.
Eyeball Engineering — Home of the dull toolbit.
Our motto: "That looks about right."
Celebrating 35 years of turning perfectly good metal into bits of useless scrap.
charlie bill
Posts: 25
Joined: Thu Jun 28, 2007 8:04 pm

Post by charlie bill »

Harlock: I believe you best bet is to use steel rail on plastic ties, having laid a bit of this track, you will have less maintaince. Any other track is a real headache.
These are just suggestions. A 75' radius, will handle any engine.
When you make your track offset your ends 12". If you have a need to, steel rail will bend about 15 degrees once the track is assembled.
Lay a heavy 8' wide plastic sheet on the ground, place track on it, then ballace. The plastic is for weed control.
If I may ask where are you located? I may be able to find out some prices which may be high and then there is the shipping.
Charlie
Curtis_F
Posts: 848
Joined: Mon Jan 06, 2003 10:14 am
Location: Reedley, Ca. 93274
Contact:

Post by Curtis_F »

On a related topic, has anyone or any club experimented with anything a kin to ribbon rail?

I've seen guys to build track from Hot Rolled Bar or Tubing buy in 20' lengths to reduce the number of joints, but I haven't seen anyone weld the lengths together.


Cheers,

Curtis F.
25+ Years of SolidWorks experience...now I feel old.
"You can lead a horse to water, but you can't make him drink."
"Winning an argument on the internet is like winning the Special Olympics."
www.facebook.com/HillcrestShops
User avatar
makinsmoke
Posts: 2265
Joined: Thu Jul 10, 2003 12:56 pm
Location: Texas Hill Country

track questions and ballast

Post by makinsmoke »

I did leave out some roadbed work that I did here in Oklahoma as I figured he'd not have the grief I have with weeds.

I cut a couple of inches below grade with a shovel (small railroad) and laid weed barrier down, then a layer of balllast. Then I laid track panels down, then the ballast between the ties. The barrier sticks up over the height of ground level. That and the slight depression helps to keep the ballast in place. Check out Chet Peterson's road bed building directions in his Railroad Engineering book.

The weed barrier has done a decent job over five years along with a light application of Roundup. I would recommend it to anyone.

I would ask what effect the sun has on plastic ties as depending on the chemical makeup plastic can degrade quite spectacularly over time in the sun.