Building the Southern Railway PS-4 Frame
- Trainman4602
- Posts: 3482
- Joined: Sat Oct 16, 2004 9:26 pm
- Location: New Jersey
Re: Building the Southern Railway PS-4 Frame
What happend to using BBC that I told you about. You get to much shrinkage with the use of plaster.
Charlie you should have end caps on the core box. I'm guessing that you will pasteing it together. You could also make a small match plate and pin it together to form a one piece box . Ram the box from the end and open it to make a one piece core no pasting neccessary.
Call me
Charlie you should have end caps on the core box. I'm guessing that you will pasteing it together. You could also make a small match plate and pin it together to form a one piece box . Ram the box from the end and open it to make a one piece core no pasting neccessary.
Call me
ALLWAYS OPERATING MY TRAIN IN A SAFE MANNER USING AUTOMATIC AIR BRAKES
- LivingLegend
- Posts: 2149
- Joined: Sun Jun 11, 2006 3:55 pm
- Location: The Boonies of Alabama
Re: Building the Southern Railway PS-4 Frame
Dave....
I would definitely use plastic/epoxy type media over plaster to make a mold or multiple pattern copies. Plaster can be pain.
You are more up to date with the materials used in the last few years to make "plastic" molds and copy patterns from them.... Been years since I've made any.
Maybe you could post a list of what's available and preferable to use?
Would help the others who have never made a pattern or mold and who might contemplate doing it in the future.
LL
I would definitely use plastic/epoxy type media over plaster to make a mold or multiple pattern copies. Plaster can be pain.
You are more up to date with the materials used in the last few years to make "plastic" molds and copy patterns from them.... Been years since I've made any.
Maybe you could post a list of what's available and preferable to use?
Would help the others who have never made a pattern or mold and who might contemplate doing it in the future.
LL
Do it right.... Or don't do it at all
I have no life. Therefore, I have a hobby
It's not that I'm apathetic, I just flat don't care
An Intellectual is nothing more than an Over-Educated IDIOT
Blogs: Where people with nothing to say..... Say it
I have no life. Therefore, I have a hobby
It's not that I'm apathetic, I just flat don't care
An Intellectual is nothing more than an Over-Educated IDIOT
Blogs: Where people with nothing to say..... Say it
Re: Building the Southern Railway PS-4 Frame
Hey Dave.
Doing it as you say with a small match plate. After pulling the two mold halves I will clamp them together and fill and ram them from the open ends. (This is how we made Fenders) Then use CO2 to harden them up.
Plan is to make up around eight of the cores and store them in a Tupperware Bowl to keep the moisture away until I can use them.
I am hoping to cast four of the journal boxes leaving two spares on the bench for the future. Also to have them when I screw up one in the machining process.
See you the 21st. Will bring my camera.
charlie
Doing it as you say with a small match plate. After pulling the two mold halves I will clamp them together and fill and ram them from the open ends. (This is how we made Fenders) Then use CO2 to harden them up.
Plan is to make up around eight of the cores and store them in a Tupperware Bowl to keep the moisture away until I can use them.
I am hoping to cast four of the journal boxes leaving two spares on the bench for the future. Also to have them when I screw up one in the machining process.
See you the 21st. Will bring my camera.
charlie
Charlie Pipes
Mid-South Live Steamers
Current Projects:
Scratch Built 3 3/4 scale 0-4-4 Forney
Little Engines American
20 Ton Shay (Castings and Plans Purchased for future)
Mid-South Live Steamers
Current Projects:
Scratch Built 3 3/4 scale 0-4-4 Forney
Little Engines American
20 Ton Shay (Castings and Plans Purchased for future)
Re: Building the Southern Railway PS-4 Frame
I started looking for a distributer locally for the BCC Plastics and found the main complany is located in Franklin Tenn. This is Just north of me just outside of Nashville.
After I get back from the trips I have scheduled thru August I will run up and pick up a gallon kit
After I get back from the trips I have scheduled thru August I will run up and pick up a gallon kit
Charlie Pipes
Mid-South Live Steamers
Current Projects:
Scratch Built 3 3/4 scale 0-4-4 Forney
Little Engines American
20 Ton Shay (Castings and Plans Purchased for future)
Mid-South Live Steamers
Current Projects:
Scratch Built 3 3/4 scale 0-4-4 Forney
Little Engines American
20 Ton Shay (Castings and Plans Purchased for future)
- Trainman4602
- Posts: 3482
- Joined: Sat Oct 16, 2004 9:26 pm
- Location: New Jersey
Re: Building the Southern Railway PS-4 Frame
Charlie
They are not in TN they are in IN
Address is:
BCC Products, Inc.
2140 Earlywood Dr.,
Franklin, IN 46131
800 556 0067
http://www.bccproducts.com
PS Save yourself time and gas send for it you will get it in a day or two. while you are at it remember to order the release
They are not in TN they are in IN
Address is:
BCC Products, Inc.
2140 Earlywood Dr.,
Franklin, IN 46131
800 556 0067
http://www.bccproducts.com
PS Save yourself time and gas send for it you will get it in a day or two. while you are at it remember to order the release
ALLWAYS OPERATING MY TRAIN IN A SAFE MANNER USING AUTOMATIC AIR BRAKES
Re: Building the Southern Railway PS-4 Frame
Oh well
Now you see why I am having cataract surgery in September.
Now you see why I am having cataract surgery in September.
Charlie Pipes
Mid-South Live Steamers
Current Projects:
Scratch Built 3 3/4 scale 0-4-4 Forney
Little Engines American
20 Ton Shay (Castings and Plans Purchased for future)
Mid-South Live Steamers
Current Projects:
Scratch Built 3 3/4 scale 0-4-4 Forney
Little Engines American
20 Ton Shay (Castings and Plans Purchased for future)
Re: Building the Southern Railway PS-4 Frame
Off to the Pennsylvania Live Steamers Run.
Charlie Pipes
Mid-South Live Steamers
Current Projects:
Scratch Built 3 3/4 scale 0-4-4 Forney
Little Engines American
20 Ton Shay (Castings and Plans Purchased for future)
Mid-South Live Steamers
Current Projects:
Scratch Built 3 3/4 scale 0-4-4 Forney
Little Engines American
20 Ton Shay (Castings and Plans Purchased for future)
Re: Building the Southern Railway PS-4 Frame
Had a great day with Dave and enjoyed seeing the Penn Live Steam Group.
While shopping in used bookstores also stumbled on a copy of "The American Railroad Passenger Car" by John H. White. It was a two volume set from 1985 in good condition for 30.00
Except for being away from home it was a great weekend.
While shopping in used bookstores also stumbled on a copy of "The American Railroad Passenger Car" by John H. White. It was a two volume set from 1985 in good condition for 30.00
Except for being away from home it was a great weekend.
Charlie Pipes
Mid-South Live Steamers
Current Projects:
Scratch Built 3 3/4 scale 0-4-4 Forney
Little Engines American
20 Ton Shay (Castings and Plans Purchased for future)
Mid-South Live Steamers
Current Projects:
Scratch Built 3 3/4 scale 0-4-4 Forney
Little Engines American
20 Ton Shay (Castings and Plans Purchased for future)
- Dick_Morris
- Posts: 2841
- Joined: Sat Jan 04, 2003 2:09 pm
- Location: Anchorage, AK
Re: Building the Southern Railway PS-4 Frame
Probably the best resource on the topic."The American Railroad Passenger Car"
Re: Building the Southern Railway PS-4 Frame
The copy of "The American Railroad Passenger Car" has turned into good bedtime reading.
Definitly worth the thirty dollars.
I also found a copy "Southern Railways System Steam Locomotives and Boats" on line
so while I am getting no time in the shop to speak of I at least am keeping my interest up.
Definitly worth the thirty dollars.
I also found a copy "Southern Railways System Steam Locomotives and Boats" on line
so while I am getting no time in the shop to speak of I at least am keeping my interest up.
Charlie Pipes
Mid-South Live Steamers
Current Projects:
Scratch Built 3 3/4 scale 0-4-4 Forney
Little Engines American
20 Ton Shay (Castings and Plans Purchased for future)
Mid-South Live Steamers
Current Projects:
Scratch Built 3 3/4 scale 0-4-4 Forney
Little Engines American
20 Ton Shay (Castings and Plans Purchased for future)
Re: Building the Southern Railway PS-4 Frame
New question.
I am home again and working on patterns and core boxes again.
In the mean time I have been looking at my two frame halves. I have planed on drilling and bolting the two frames together to machine them as a matched pair. I am planning on starting off with the top line of the frame and use this and the center of the middle journal box as my reference point.
As a newbee I am needing information on the simple act of drilling holes for the various things that bolt to the frame.
If I lay out the holes with a center drill and then drill the hole out will it go straight thru the entire inch and a half of bolted together frames or should I lay them out and drill them individually on the two seperated sides.
I am home again and working on patterns and core boxes again.
In the mean time I have been looking at my two frame halves. I have planed on drilling and bolting the two frames together to machine them as a matched pair. I am planning on starting off with the top line of the frame and use this and the center of the middle journal box as my reference point.
As a newbee I am needing information on the simple act of drilling holes for the various things that bolt to the frame.
If I lay out the holes with a center drill and then drill the hole out will it go straight thru the entire inch and a half of bolted together frames or should I lay them out and drill them individually on the two seperated sides.
Charlie Pipes
Mid-South Live Steamers
Current Projects:
Scratch Built 3 3/4 scale 0-4-4 Forney
Little Engines American
20 Ton Shay (Castings and Plans Purchased for future)
Mid-South Live Steamers
Current Projects:
Scratch Built 3 3/4 scale 0-4-4 Forney
Little Engines American
20 Ton Shay (Castings and Plans Purchased for future)
Re: Building the Southern Railway PS-4 Frame
On my (smaller) frame I drilled through with them bolted together. It should go a lot faster than separately.
I also drilled holes in the tops and bottoms of the frames bolted together ensuring that they were aligned for-aft.
I also drilled holes in the tops and bottoms of the frames bolted together ensuring that they were aligned for-aft.