Re: Boston & Albany K6b Pacific

Post by BobbyT »

Thanks Justin,
Yes it does feel good to finally get to work on this engine. :D

I didn't get much of anything done this week because of scheduling conflicts but I did manage to steal a little time while SWMBO ran to the store, to trim off some excess material from the frames cross brace.
Attachments
100_2184.JPG
Last edited by BobbyT on Mon Jul 14, 2014 7:46 pm, edited 1 time in total.
BobbyT
Posts: 258
Joined: Mon Feb 02, 2009 10:34 pm
Location: South Florida

Re: Boston & Albany K6b Pacific

Post by BobbyT »

While checking the full size plans against my frame, I realized that my frame is about an inch short. So a quick and dirty remedy is to make the front frame spreader a bit longer than the LE one I was going to use.

I decided to make it out of solid 1" x 5" flat bar. The extra weight over the pilot would be beneficial.
First step was to square up the sides then machine it down to 4 5/8".
Attachments
IMG_20140711_191519.jpg
BobbyT
Posts: 258
Joined: Mon Feb 02, 2009 10:34 pm
Location: South Florida

Re: Boston & Albany K6b Pacific

Post by BobbyT »

Then we contoured the front and welded on a flat bar to mount the pilot beam to.
Attachments
100_2189.JPG
chooch
Posts: 567
Joined: Mon Dec 09, 2013 11:58 pm
Location: East Central Florida

Re: Boston & Albany K6b Pacific

Post by chooch »

Bobby T,
You sure have come a Lonnnng way since your original "Critter". Nice doings and keep going.
chooch
BobbyT
Posts: 258
Joined: Mon Feb 02, 2009 10:34 pm
Location: South Florida

Re: Boston & Albany K6b Pacific

Post by BobbyT »

Hello Chooch, how have you been?

Finished up on the nose piece today. I removed some excess material from the underside to create a pocket. This pocket will allow easier access to the pilot beam bolts later on.
Attachments
IMG_20140731_183305.jpg
BobbyT
Posts: 258
Joined: Mon Feb 02, 2009 10:34 pm
Location: South Florida

Re: Boston & Albany K6b Pacific

Post by BobbyT »

Here is the nose piece installed. I know what you are thinking; "That sticks out too far". No, in reality the frame rails are too short for the locomotive I am building. This is why I made the longer nose piece. Once all the appliances are installed it should not be noticeable... unless you look for it. :wink:
Attachments
IMG_20140802_144843.jpg
chooch
Posts: 567
Joined: Mon Dec 09, 2013 11:58 pm
Location: East Central Florida

Re: Boston & Albany K6b Pacific

Post by chooch »

Bobby T.
Doing OK, a little slower and a lot older but just as bad as before.
Nice to see you are still Quite active and hope get a very Nice locomotive built. Good luck.
Larry D
BobbyT
Posts: 258
Joined: Mon Feb 02, 2009 10:34 pm
Location: South Florida

Re: Boston & Albany K6b Pacific

Post by BobbyT »

My friend Peter Bialecki has started to turn the drivers.
Attachments
IMG_20140816_131037.jpg
BobbyT
Posts: 258
Joined: Mon Feb 02, 2009 10:34 pm
Location: South Florida

Re: Boston & Albany K6b Pacific

Post by BobbyT »

This batch is waiting on the crank pin hole.
Attachments
IMG_20140816_131043.jpg
BobbyT
Posts: 258
Joined: Mon Feb 02, 2009 10:34 pm
Location: South Florida

Re: Boston & Albany K6b Pacific

Post by BobbyT »

While Peter is working on the drivers, I have shifted focus to the front truck. The center and heart rocker assembly is standard LE design but the side frames had to be lengthened. Here is a LE side frame for size comparison. After installing the truck assembly we noticed some clearance issues with the longer pilot truck and 36" pilot wheels. The frame has been disassembled and some of the material in the area directly behind the cylinders will be removed on the water jet table. Sorry I didn't get any photo of that.
Attachments
IMG_20140910_183841.jpg
BobbyT
Posts: 258
Joined: Mon Feb 02, 2009 10:34 pm
Location: South Florida

Re: Boston & Albany K6b Pacific

Post by BobbyT »

I tried to modify a photo to illustrate the areas of the frame to be removed. Since we will have the frames on the water jet table, Bob Dean suggested we remove a section in front of the lead driver so we can install a spring equalization adjuster there.
Attachments
100_2182modified.jpg
SteamHeaton
Posts: 45
Joined: Thu Mar 12, 2009 12:25 pm
Location: Mount Vernon IL.

Re: Boston & Albany K6b Pacific

Post by SteamHeaton »

Nice work Bobby. I really enjoyed reading through your build so far. Looking forward to following along. Ray III
Post Reply