Thanks peter! It's gonna be a beast, just the pipe for the barrel is probably 75 pounds.
I will be there all weekend and probably with what I have done on the boiler to show. So I will see you at the railroad!
I will be there all weekend and probably with what I have done on the boiler to show. So I will see you at the railroad!
-Tristan
Projects
-2.5" scale Class A 20 Ton Shay
Steam Siphon: https://www.shapeways.com/shops/leavitt ... tive-works
Projects
-2.5" scale Class A 20 Ton Shay
Steam Siphon: https://www.shapeways.com/shops/leavitt ... tive-works
-
- Posts: 158
- Joined: Sat Jan 04, 2003 12:33 pm
- Location: Huntsville, AL U.S.A.
Re: Building the 2.5" Scale Shay
What size pipe is the boiler constructed from?
-
- Posts: 983
- Joined: Wed Jun 27, 2012 5:24 pm
- Location: Marietta, Georgia
Re: Building the 2.5" Scale Shay
8" sch 40 pipe
-Tristan
Projects
-2.5" scale Class A 20 Ton Shay
Steam Siphon: https://www.shapeways.com/shops/leavitt ... tive-works
Projects
-2.5" scale Class A 20 Ton Shay
Steam Siphon: https://www.shapeways.com/shops/leavitt ... tive-works
-
- Posts: 158
- Joined: Sat Jan 04, 2003 12:33 pm
- Location: Huntsville, AL U.S.A.
Re: Building the 2.5" Scale Shay
Thanks! Considering the Shay as a project, and have read the thread, with interest.
-
- Posts: 983
- Joined: Wed Jun 27, 2012 5:24 pm
- Location: Marietta, Georgia
Re: Building the 2.5" Scale Shay
I recommend it! I've made a few mods to mine but the prints are very clear and a lot of it is just barstock
-Tristan
Projects
-2.5" scale Class A 20 Ton Shay
Steam Siphon: https://www.shapeways.com/shops/leavitt ... tive-works
Projects
-2.5" scale Class A 20 Ton Shay
Steam Siphon: https://www.shapeways.com/shops/leavitt ... tive-works
Re: Building the 2.5" Scale Shay
I've been building one of these as well over the past year. I'm trying to keep it to only building the loco 1.5 times instead of twice, but I still have a ways to go. After reading some of the comments on boiler construction, there were a few things in the back of my mind: I understand the convenience of having a 300+ amp unit, but most of the guys on YT demoing 6G joints are doing multiple passes per joint, usually starting at around 80-90 amps for the root pass on 6" sch 40, then bumping up to around 120 A for the hot pass and cap and fill, usually walking the cup if it's a TIG only process. I figured building a live steam boiler would at worst be 3G or 5G depending on the orientation of the barrel. Also, for a final sanity check after a success hydro test, what would an x-ray test typically run $ wise?
-
- Posts: 983
- Joined: Wed Jun 27, 2012 5:24 pm
- Location: Marietta, Georgia
Re: Building the 2.5" Scale Shay
Ive been running 180 amps for everything so far and using 3/32" ER70S-6 filler which helps cool the puddle. And so far I've been able to position everything with magnetic welders squares to keep it in a 1F/G position with just a little 2F/G and 3F/G in places. It really isnt a hard process if you have a good idea of what youre doing and how you're going to do it. As for the cost of radiographic testing, I have no idea. I dont know anybody who does that kind of testing. Most just do a hydro, or a dye penetrant test at most. These things have such a high safety factor the only ones Ive seen have issues were either very very poorly welded or were run on water that was absolute garbage.
Would love to see how you're coming along on your shay! Theres several under construction that I know of and most will become operational in the next year or two.
Would love to see how you're coming along on your shay! Theres several under construction that I know of and most will become operational in the next year or two.
-Tristan
Projects
-2.5" scale Class A 20 Ton Shay
Steam Siphon: https://www.shapeways.com/shops/leavitt ... tive-works
Projects
-2.5" scale Class A 20 Ton Shay
Steam Siphon: https://www.shapeways.com/shops/leavitt ... tive-works
-
- Posts: 983
- Joined: Wed Jun 27, 2012 5:24 pm
- Location: Marietta, Georgia
Re: Building the 2.5" Scale Shay
Also, since my last update, I took my welding sample box up to the railroad after hydroing it and the cutting it apart to do a macro etch on the welds and got an "Atta boy!" from both a friend who welded his own mikado boiler and a certified boiler inspector. So I carried on with the firebox. Now all 24 staybolts are welded to the inner sheets and all of the inner sheets and the crown sheet are root welded together. Next up is the filler and cap passes on the firebox followed by welding the girder stays to the crown sheet. I'll post some pictures tonight when I bring the firebox in off the welding table.
-Tristan
Projects
-2.5" scale Class A 20 Ton Shay
Steam Siphon: https://www.shapeways.com/shops/leavitt ... tive-works
Projects
-2.5" scale Class A 20 Ton Shay
Steam Siphon: https://www.shapeways.com/shops/leavitt ... tive-works
-
- Posts: 983
- Joined: Wed Jun 27, 2012 5:24 pm
- Location: Marietta, Georgia
Re: Building the 2.5" Scale Shay
-Tristan
Projects
-2.5" scale Class A 20 Ton Shay
Steam Siphon: https://www.shapeways.com/shops/leavitt ... tive-works
Projects
-2.5" scale Class A 20 Ton Shay
Steam Siphon: https://www.shapeways.com/shops/leavitt ... tive-works
-
- Posts: 2930
- Joined: Mon Nov 10, 2014 1:39 pm
- Location: Woodinville, Washington
Re: Building the 2.5" Scale Shay
Nice work, and very informative photos. Couple of questions: what does 1F/G, 2F/G, 3 F/G mean?
Also, how do you go about welding the inside of outer crown sheet pieces to the stay-bolts? I've always heard one needs to place weldments both inside and outside the shell. But can't see how,the staybolts would be accessible inside the shell.
Thanks
Glenn
Also, how do you go about welding the inside of outer crown sheet pieces to the stay-bolts? I've always heard one needs to place weldments both inside and outside the shell. But can't see how,the staybolts would be accessible inside the shell.
Thanks
Glenn
Moderator - Grand Scale Forum
Motive power : 1902 A.S.Campbell 4-4-0 American - 12 5/8" gauge, 1955 Ottaway 4-4-0 American 12" gauge
Ahaha, Retirement: the good life - drifting endlessly on a Sea of projects....
Motive power : 1902 A.S.Campbell 4-4-0 American - 12 5/8" gauge, 1955 Ottaway 4-4-0 American 12" gauge
Ahaha, Retirement: the good life - drifting endlessly on a Sea of projects....
Re: Building the 2.5" Scale Shay
Hi Tristan,
Looks great. When you got all of the sheets water jetted out, what allowances did you tell the jet place to cut to, or was it right to John's print?
Regards,
John
Looks great. When you got all of the sheets water jetted out, what allowances did you tell the jet place to cut to, or was it right to John's print?
Regards,
John
-
- Posts: 983
- Joined: Wed Jun 27, 2012 5:24 pm
- Location: Marietta, Georgia
Re: Building the 2.5" Scale Shay
Glenn, 1, 2, and 3 F/G all refer to welding test positions. F is for fillet weld and G is for groove weld, with 1 being a flat position, 2 being a horizontal position, and 3 being a vertical position.Glenn Brooks wrote:Nice work, and very informative photos. Couple of questions: what does 1F/G, 2F/G, 3 F/G mean?
Also, how do you go about welding the inside of outer crown sheet pieces to the stay-bolts? I've always heard one needs to place weldments both inside and outside the shell. But can't see how,the staybolts would be accessible inside the shell.
Thanks
Glenn
Also, there is no way to put a weld on the water leg side of the staybolts. Its just not possible to get down in there with any sort of welder and place a bead.
John, I redesigned my boiler in CAD a little. I went for a 3 piece design for the crown and side sheets over John's one piece design and also went for 3/4 flues over John's 5/8 as I'll be burning solid fuel instead of oil. As for tolerances, all of the sheets were cut to dimension as the cutters tolerances were close enough for that. But all of the holes were cut 0.01" under size so they could be drilled out to size, and for the flue holes, reamed out.jlakes85 wrote:Hi Tristan,
Looks great. When you got all of the sheets water jetted out, what allowances did you tell the jet place to cut to, or was it right to John's print?
Regards,
John
-Tristan
Projects
-2.5" scale Class A 20 Ton Shay
Steam Siphon: https://www.shapeways.com/shops/leavitt ... tive-works
Projects
-2.5" scale Class A 20 Ton Shay
Steam Siphon: https://www.shapeways.com/shops/leavitt ... tive-works