Project: N&W class J on 5"gauge
Moderator: Harold_V
- Steamchris
- Posts: 487
- Joined: Fri Jan 27, 2012 3:48 pm
- Location: Duisburg/Germany
- Contact:
Re: Project: N&W class J on 5"gauge
Russ,
the left pumped is not so far fabricated as the right one.
Left side still has to be milled, so that the part can be clamped better, there is still some material on top of it.
On the left I simply put the lanterns together incorrectly for the picture. As is say...left side is a few work steps behind the right one.
You have probably also noticed that the central area between the lanterns has already been closed with a sheet metal on the right pump.
Kind Regards
the left pumped is not so far fabricated as the right one.
Left side still has to be milled, so that the part can be clamped better, there is still some material on top of it.
On the left I simply put the lanterns together incorrectly for the picture. As is say...left side is a few work steps behind the right one.
You have probably also noticed that the central area between the lanterns has already been closed with a sheet metal on the right pump.
Kind Regards
The light at the end of the tunnel could be a train
Health and Safety Notice
due to the current economic circumstances , the light at the end of the tunnel
has been switched off !
Health and Safety Notice
due to the current economic circumstances , the light at the end of the tunnel
has been switched off !
Re: Project: N&W class J on 5"gauge
Thanks, Steamchris. I understand now.
New word in use for me: "lanterns." I assume those are the middle pieces between the top and bottom cylinders.
Understandable description. Language translations can be fun.
Keep machining!
RussN
New word in use for me: "lanterns." I assume those are the middle pieces between the top and bottom cylinders.
Understandable description. Language translations can be fun.
Keep machining!
RussN
- Steamchris
- Posts: 487
- Joined: Fri Jan 27, 2012 3:48 pm
- Location: Duisburg/Germany
- Contact:
Re: Project: N&W class J on 5"gauge
Hi Guys
I would like to share some news about our J 611 with you. After almost all work on the locomotive had been completed, we could concentrate on the tender bogies. With the help of a jig we milled a lot of material out of the cast parts. Here we had to think of the sheet metal construction of our Y6b trucks, that would probably have been the cheaper and safer way. Because the castings have some inaccuracies, but we got them right. Here I would like to thank Asteamhead again for giving me the castings and some other help with the construction of the J.
Almost at the same time as the successful stoker screw repair of the original J 611, we were able to heat our model in the garden for the first time.
It was such a great moment to throw the first coal on the grate after almost 8 years of construction. The boiler is very powerful and produces tons of steam, almost too much for. With hard driving you can hardly get the steam away, so we need valves that can blow off more steam.
All in all, the campaign was a success, except for a few small things, such as a leaky whistle and a feedwater pump that went on strike at first, everything worked wonderfully after some repairs and J did a great job.
When loading it into the garden, we also weighed it and the desired weight of 280kg was reached, so that there is enough friction weight for the power. When we braked the chassis during operation, you could hear the exhaust, which sounds really great. Here are a few pictures, a video of the first heat up and the first run on tracks, which is planed for the next week, will follow ...
All the best
Chris
I would like to share some news about our J 611 with you. After almost all work on the locomotive had been completed, we could concentrate on the tender bogies. With the help of a jig we milled a lot of material out of the cast parts. Here we had to think of the sheet metal construction of our Y6b trucks, that would probably have been the cheaper and safer way. Because the castings have some inaccuracies, but we got them right. Here I would like to thank Asteamhead again for giving me the castings and some other help with the construction of the J.
Almost at the same time as the successful stoker screw repair of the original J 611, we were able to heat our model in the garden for the first time.
It was such a great moment to throw the first coal on the grate after almost 8 years of construction. The boiler is very powerful and produces tons of steam, almost too much for. With hard driving you can hardly get the steam away, so we need valves that can blow off more steam.
All in all, the campaign was a success, except for a few small things, such as a leaky whistle and a feedwater pump that went on strike at first, everything worked wonderfully after some repairs and J did a great job.
When loading it into the garden, we also weighed it and the desired weight of 280kg was reached, so that there is enough friction weight for the power. When we braked the chassis during operation, you could hear the exhaust, which sounds really great. Here are a few pictures, a video of the first heat up and the first run on tracks, which is planed for the next week, will follow ...
All the best
Chris
The light at the end of the tunnel could be a train
Health and Safety Notice
due to the current economic circumstances , the light at the end of the tunnel
has been switched off !
Health and Safety Notice
due to the current economic circumstances , the light at the end of the tunnel
has been switched off !
Re: Project: N&W class J on 5"gauge
Very nice, and well done! Continued success.
H
H
Wise people talk because they have something to say. Fools talk because they have to say something.
-
- Posts: 2166
- Joined: Thu May 22, 2003 8:17 am
- Location: Bel Air, MD
Re: Project: N&W class J on 5"gauge
Congratulations my friend! She looks amazing!
She’ll be cruising around Huserland (and many other tracks) in no time.
Andy
She’ll be cruising around Huserland (and many other tracks) in no time.
Andy
Clausing 10x24, Sheldon 12" shaper, ProtoTrak AGE-2 control cnc on a BP clone, Reed Prentice 14" x 30", Sanford MG 610 surface grinder, Kalamazoo 610 bandsaw, Hardinge HSL speed lathe, Hardinge HC chucker, Kearney and Trecker #2K plain horizontal mill, Haas TL-1 lathe.
Re: Project: N&W class J on 5"gauge
Congratulations Chris!
Good to see steam after such a long construction project.
More work to go, but it should be fun to do.
Keep posting your work and successes!
RussN
Good to see steam after such a long construction project.
More work to go, but it should be fun to do.
Keep posting your work and successes!
RussN
- JBodenmann
- Posts: 3865
- Joined: Sun Oct 26, 2003 1:37 pm
- Location: Tehachapi, California
Re: Project: N&W class J on 5"gauge
Hello My Friends
This locomotive is really the most to say the least! It even has a functioning stoker! The stoker is a major project on its own. I wish I could see it in person, most excellent!
Jack
This locomotive is really the most to say the least! It even has a functioning stoker! The stoker is a major project on its own. I wish I could see it in person, most excellent!
Jack
Re: Project: N&W class J on 5"gauge
What's your next engine project?
Someone needs to build a B&O EM-1 2-8-8-4 or maybe a NYC 4-8-4...
Someone needs to build a B&O EM-1 2-8-8-4 or maybe a NYC 4-8-4...
- Bill Shields
- Posts: 10548
- Joined: Fri Dec 21, 2007 4:57 am
- Location: 39.367, -75.765
- Contact:
- Dick_Morris
- Posts: 2846
- Joined: Sat Jan 04, 2003 2:09 pm
- Location: Anchorage, AK
Re: Project: N&W class J on 5"gauge
Nice! I'm looking forward to the video.
- Steamchris
- Posts: 487
- Joined: Fri Jan 27, 2012 3:48 pm
- Location: Duisburg/Germany
- Contact:
Re: Project: N&W class J on 5"gauge
Hey Guys,
thanks for your words. No i will not fire it by a stoker.
And...now is not the time to think about new project's...there is a lot of work to do, to finish 611 will take another year..mayby more. After 611 i will make my dream come true to restore my Dad's first Locomotive that he builds 40 years ago...a nice Decapot .
And then.......there are 8 Locomotives to take care of.
All the best
Chris
thanks for your words. No i will not fire it by a stoker.
And...now is not the time to think about new project's...there is a lot of work to do, to finish 611 will take another year..mayby more. After 611 i will make my dream come true to restore my Dad's first Locomotive that he builds 40 years ago...a nice Decapot .
And then.......there are 8 Locomotives to take care of.
All the best
Chris
The light at the end of the tunnel could be a train
Health and Safety Notice
due to the current economic circumstances , the light at the end of the tunnel
has been switched off !
Health and Safety Notice
due to the current economic circumstances , the light at the end of the tunnel
has been switched off !
first steamup: N&W class J on 5"gauge
Chris,
That's wonderful !
Congratulations !
The satisfaction after all those years of work is immense.
Your work is outstanding. Keep us posted on the tender progress?
Regards,
Andy
That's wonderful !
Congratulations !
The satisfaction after all those years of work is immense.
Your work is outstanding. Keep us posted on the tender progress?
Regards,